Product Catalog
china factory OEM/Stainless Steel/Ductile V Belt Pully/Falt Pully/Taper Bush Pully/Split V Pully/Step Pully/Single Pully/Double Pully/Idle Pully Sand Casting Parts manufacturers
Item Description
OEM maker supply pullys
| Product Name | Casting cast iron gray/ductile iron/stainless metal/carbon metal products |
| Material | Ferrous supplies:forged iron, gray iron, ductile iron, austempered ductile iron , carbon metal,stainless steel, minimal alloy steel, large chromium/manganese steel Non-ferrous: aluminum alloy, copper alloy,brass, bronze titanium alloy(getting built) |
| Process | Lost foam casting,Resin sand casting, CNC machining |
| Equipment | Molding machine, dropped foam casting manufacturing line, CNC machining middle, common equipment equipment,CNC laser reducing machine,huge-scale press device |
| Finish | zinc phosphide, zinc plating, hot dip galvanized, e-coating, spray paint, black oxide coating ,anodized,passivation and other people |
| Testing CZPT | Spectrum analyzer, tension tester, hardness tester, three coordinates measuring instrument, caliper, micrometer, dial gauge, microscope, roughness tester, salt spray testing equipment, ultrasonic flaw detector, X-ray detection device, magnetic particle flaw detector, air tightness tests machine, thickness gauge |
| Product Software | Engineering & mining operates |
| Other principal casting products | Automobile elements,large mining tools equipment, CZPT machinery components, valve components, massive diameter pipe fittings, , agricultural equipment components,construction machinery, CZPT ,physique situation and so on. |
Manufacturing facility
Inspection Tools
Certifications
FAQ
1.How can I get the quotation?
Make sure you give us your drawing,amount,weight and content of the item.
2.If you don’t have the drawing,can you make drawing for me? Of course,we are capable to make the drawing of your sample duplicate the sample.
3.When can I get the sample and your principal purchase time? Sample time: 35-40 days following commence to make mould. Purchase time: 35-40 times, the correct time depends on item.
4.What is your payment strategy? Tooling:100% T/T CZPT d Buy time:fifty% deposit,50%to be compensated just before shipment.
5.Which sort of file structure you can read? PDF, IGS, DWG, CZPT , MAX
6.What is your floor treatment? Including: powder coating, sand blasting, portray, sprucing, acid pickling, anodizing, enamel, zinc plating, scorching-dip galvanizing, electrophoresis, chrome plating.
seven.What is your way of packing? Normally we pack items according to CZPT ers’ specifications.
